PROJEK MASS RAPID TRANSIT LALUAN 2: SUNGAI BULOH – SERDANG – PUTRAJAYA (PACKAGE V203)

Cemerlang Mega team was carrying out Pre-Task Planning Safety Talk

Getting ready on top of the Hanger Beam to receive the 1st segment

Lifting up the Hanger Beam for the installation onto the pier head

Cemerlang Mega to design and supply the Hanger Beam

Last Segment to be installed into position before the stitching

Installation of the Segment into position by using Mobile Crane

End span to be adjusted to the correct position before stitching